Huerto solar de gran escala en el interior de la Costa Blanca, Alicante, al atardecer

01 / Intro

Helping industry, agriculture and landowners across Costa Blanca cut energy costs

PV, air conditioning and heat pumps for the winter, right up to ground-mount plants — from 30 kWp to 100 MWp

Solar power for businesses on the Costa Blanca: industrial solar installations and ground-mount solar farms, engineered, permitted and built by a local EPC team in Alicante. Cut energy costs by up to 70%, secure your grid connection, and put idle land to work.

Installed
11.46 MWp+
Speed
48h response
Policy
No obligation quote
Team
Local EPC experts

Built for Large-Scale Generation

Residential solar logic does not scale. We design commercial and industrial solar plants around load profiles, grid capacity, structural limits and 25-year yield — not around a roof full of panels.

01

Ground-Mount Solar Parks

Open-field plants from 1 MWp to 50 MWp: land screening, yield modelling, tracker or fixed-tilt design, and full grid-connection management.

02

Industrial Rooftops

Logistics halls, factories and cold stores. Structural survey, ballasted or fixed mounting, and production matched to your load profile.

03

Self-Consumption & PPA

Direct self-consumption, collective self-consumption or a long-term PPA — we model each scenario against your real tariff and consumption.

04

Storage & Grid Services

Utility-scale battery systems for peak shaving, backup and arbitrage, integrated with your plant's SCADA from day one.

Get Your Site Assessment

Invest in Rising Energy Prices

Industrial consumers in Valencia and Alicante face some of the highest energy costs in Spain. Industrial self-consumption solar is the fix — here is why.

01 / Task to solve

Industrial tariffs from €1,000–€2,000,000 per year

Energy is now one of the largest lines in your P&L. On-site generation removes the volatile part of it.

02 / Task to solve

Grid capacity is the bottleneck

Connection points are scarce. We secure capacity, run the permitting and handle the utility dialogue for you.

03 / Task to solve

Idle land, zero yield

Unused hectares can carry a solar park with a predictable 25-year revenue stream instead of nothing.

The solution? Solar designed around your plant, not your roof.

Cubierta de nave industrial en Alicante totalmente cubierta de placas solares

Your free on-site appointment within 48 hours

No obligation. No hidden costs.

Get Free Assessment Now

3D Planning & Layout Design

Before anything is ordered, we model your roof or land in 3D. Every proposal includes a panel layout plan, so you can see exactly how many modules fit, where they sit and what they will produce.

Flat-roof layout, 12 modules with ballast frames
Flat-roof layout, 12 modules with ballast frames
Villa layout including string plan
Villa layout including string plan
Commercial roof in Benissa — full coverage
Commercial roof in Benissa — full coverage
Tiled villa roof, orientation optimised
Tiled villa roof, orientation optimised

Completed Projects

Installed systems: roof layouts, mounting and switchgear, all carried out by our own team.

Full roof coverage, multi-family building
Full roof coverage, multi-family building
Module mounting during an ongoing project
Module mounting during an ongoing project
Aerial view of a completed rooftop system
Aerial view of a completed rooftop system
Metering and switchgear of the system
Metering and switchgear of the system
Hall roof with full coverage, agricultural business
Hall roof with full coverage, agricultural business
Mounting the module rows on a trapezoidal sheet roof
Mounting the module rows on a trapezoidal sheet roof
Detail of the module layout on the hall roof
Detail of the module layout on the hall roof
Installation team fixing the modules
Installation team fixing the modules
Completed rooftop system on a commercial building
Completed rooftop system on a commercial building
Elevated mounting on a flat roof with ballast
Elevated mounting on a flat roof with ballast
Flat-roof system in row arrangement
Flat-roof system in row arrangement
East-west layout on a flat roof
East-west layout on a flat roof
Large-scale reference projects

From Assessment to Megawatts in 5 Steps

We handle everything. You get the energy.

  1. 01

    Request Your Assessment

    Send us your consumption data or land details. We respond within 48 hours.

  2. 02

    We Analyse Site & Grid

    Site visit, structural or land survey, grid capacity check and yield simulation.

  3. 03

    Engineering & Business Case

    Layout, single-line diagram, CAPEX, subsidies, payback and IRR — all in one proposal.

  4. 04

    Permitting & Construction

    We handle licences, utility filings and build with our own project team.

  5. 05

    Commissioning & O&M

    Grid connection, monitoring handover, and a maintenance plan that protects your yield.

Where do we work?

We develop and build solar from Alicante up the Costa Blanca to the Valencia area — industrial estates, farmland and open sites, plus villas and homes.

Costa Blanca coastline at golden hour

Subsidies and Incentives — We Advise You

Public support programmes for solar exist. We check what applies to your project and always pass on the current programmes to our clients.

Advice

We review individually which programmes fit your project.

Current programmes

Regional and national schemes change constantly — we keep you up to date.

Application support

We help with documents and filing.

See All Subsidies

Got Questions? We've Got Answers.

How long does an industrial project take?

A rooftop plant of 500 kWp typically takes 3–5 months from contract to grid connection. Ground-mount parks depend on permitting and grid access, usually 9–18 months.

Do I need batteries?

Not always. If your load profile matches daytime production, batteries are optional. For peak shaving, backup or arbitrage they often pay for themselves.

What happens during a blackout?

With a storage system and an island-capable inverter, critical loads keep running when the grid goes down.

Can I lease out my land instead?

Yes. We can develop the project and lease the land, or build it for you as an EPC contractor — both models are on the table.

How much will I actually save?

Most industrial clients cut their electricity cost by 40–70%. The exact figure depends on tariff, consumption curve and system size.

What subsidies can I get?

There are regional and national support programmes as well as tax advantages. We advise you, check the requirements and always pass on the current programmes.

Get Your Free Assessment

Free project check

Ready to cut your energy cost by up to 70%?

Send us your consumption data or land details. No obligation. No hidden costs.